Fire Safety Advisory Unit

The Fire Safety Advisory Unit provides consultation services to industry on the performance-based design brief (PBDB) in the performance solution process. A PBDB is prepared during the design phase by a designer or engineer seeking preliminary input into fire engineering concepts for proposed development having a performance solution.

The unit also assesses performance solution reports for proposed development for the purpose of furnishing an initial fire safety report (IFSR) under section 27 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021.

The Fire Safety Advisory Unit will:

  • Review PBDB consultation and provide recommendations on performance solutions presented
  • Liaise with stakeholders and negotiate on proposed performance solutions for a project
  • Assess a performance solution report for the purpose of furnishing an IFSR
  • Attend consultation meetings with industry representatives when considered necessary by FRNSW.

Related documents

Download TypePublishedOwner
Access for fire brigade vehicles and firefighters (PDF , 2.8 MB)Fire Safety Guideline2020-11-17Fire Safety
Accessibility of fire hydrants (PDF , 220.8 KB)Position Statement Summary2024-04-29Fire Safety
Applicable Building Code of Australia (BCA) (PDF , 240.5 KB)Position Statement Summary2024-04-29Fire Safety
Application of fire sprinkler concessions under Specification 18 of the NCC (PDF , 182.8 KB)Position Statement Summary2024-08-30Fire Safety
Automated vehicle parking system (PDF , 188.4 KB)Position Statement Summary2024-04-29Fire Safety
Automatic storage and retrieval systems (ASRS) (PDF , 138.3 KB)Position Statement Summary2024-12-05Fire Safety
CFD zone modelling inputs (MS Word Document, 653.5 KB)Forms2024-11-01Fire Safety,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Consultation on the performance-based design brief (PBDB) (PDF , 218.0 KB)Position Statement Summary2024-08-30Fire Safety
Consultation with the relevant fire brigade, fire service or fire authority (PDF , 216.3 KB)Position Statement Summary2024-04-29Fire Safety
Dry fire hydrant system (PDF , 217.6 KB)Position Statement Summary2024-06-04Fire Safety
Electric vehicles (EV) and EV charging equipment (PDF , 224.0 KB)Position Statement Summary2024-06-04Fire Safety
Emergency plan requirements at sites having lithium batteries (PDF , 252.8 KB)Position Statement Summary2024-12-05Fire Safety
Exemption from fire safety standards (PDF , 238.2 KB)Position Statement Summary2024-04-29Fire Safety
Extended fire hydrant coverage (PDF , 182.4 KB)Position Statement Summary2024-06-14Fire Safety
External combustible cladding (PDF , 177.8 KB)Position Statement Summary2024-06-14Fire Safety
FRNSW compatible Storz hose connections (PDF , 286.1 KB)Technical Information Sheet2026-01-13Fire Safety
FRNSW hose connections (PDF , 172.5 KB)Position Statement Summary2026-01-13Fire Safety
FRNSW meeting application (MS Word Document, 602.2 KB)Forms2026-01-30Fire Safety
FRNSW pump performance for high rise buildings (PDF , 215.5 KB)Position Statement Summary2024-12-05Fire Safety
FRNSW written report application (MS Word Document, 607.2 KB)Forms2026-01-30Fire Safety
Fire Safety Position Paper - Electric vehicles (EV) and EV charging equipment in the built environment v1.0 (PDF , 4.4 MB)Research2025-03-15Fire Safety
Fire brigade booster operating pressure (PDF , 181.9 KB)Position Statement Summary2024-12-05Fire Safety
Fire brigade boosters with inlet inserts (PDF , 394.8 KB)Technical Information Sheet2019-03-12Fire Safety
Fire doors with fire activated retaining devices (e.g. bolts) (PDF , 214.8 KB)Position Statement Summary2024-12-23Fire Safety
Fire engineering for existing buildings (PDF , 215.0 KB)Position Statement Summary2024-09-12Fire Safety
Fire hydrant concessions for existing buildings (PDF , 1.3 MB)Technical Information Sheet2020-02-27Fire Safety
Fire hydrant system - single vs multiple (PDF , 138.3 KB)Position Statement Summary2024-10-09Fire Safety
Fire hydrant system in existing building or premises (PDF , 211.8 KB)Position Statement Summary2024-09-12Fire Safety
Fire hydrant system in new building or premises (PDF , 184.6 KB)Position Statement Summary2024-08-30Fire Safety
Fire hydrant system signage (PDF , 602.3 KB)Position Statement Summary2024-12-05Fire Safety
Fire hydrants for minor residential development (PDF , 3.2 MB)Fire Safety Guideline2016-09-01Fire Safety
Fire safety in early childhood centres (PDF , 236.4 KB)Position Statement Summary2024-09-12Fire Safety
Fire safety study process (PDF , 219.3 KB)Position Statement Summary2024-06-14Fire Safety
Fire sprinkler system in existing building or premises (PDF , 214.1 KB)Position Statement Summary2024-09-12Fire Safety
Fire sprinklers in class 1 buildings (i.e. homes) (PDF , 177.7 KB)Position Statement Summary2024-08-30Fire Safety
Fire sprinklers in class 2 and 3 buildings (PDF , 220.1 KB)Position Statement Summary2024-09-30Fire Safety
Fixed suction connection for below-ground water supply (PDF , 212.9 KB)Position Statement Summary2024-08-30Fire Safety
Guideline for impulse fans in car parks (PDF , 548.5 KB)Fire Safety Guideline2014-10-09Fire Safety Advisory Unit
Hydraulic fire safety system design (PDF , 217.1 KB)Position Statement Summary2024-12-05Fire Safety
Initial fire safety report (IFSR) application (MS Word Document, 647.6 KB)Forms2026-01-30Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Initial fire safety report process (PDF , 812.8 KB)Technical Information Sheet2020-01-15Fire Safety Advisory Unit
Light wall steel pipe in fire hydrant systems (PDF , 193.9 KB)Position Statement Summary2024-12-05Fire Safety
Open yard storage of battery energy storage systems (BESS) (PDF , 276.2 KB)Position Statement Summary2024-12-05Fire Safety
Performance-based design brief (PBDB) consultation (MS Word Document, 683.6 KB)Forms2026-01-30Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Pilot operated pressure reduction valve (PO-PRV) installation (PDF , 382.7 KB)Position Statement Summary2024-12-05Fire Safety
Plastic pipe in combined fire hydrant and sprinkler systems (PDF , 175.2 KB)Position Statement Summary2024-12-05Fire Safety
Pressure reducing fire hydrant valve (PRFHV) (PDF , 177.7 KB)Position Statement Summary2024-08-30Fire Safety
Security/screen doors fitted to sole-occupancy units (SOUs) (PDF , 174.6 KB)Position Statement Summary2024-08-30Fire Safety
Self-storage facilities (PDF , 149.1 KB)Position Statement Summary2024-10-09Fire Safety
Small-bore suction connections (PDF , 212.7 KB)Position Statement Summary2024-06-20Fire Safety