Fire Safety Liaison Unit

The Fire Safety Liaison Unit engages with Department of Planning, Housing and Infrastructure, Local Government, SafeWork NSW and the NSW Environment Protection Authority on facilities and developments that pose potentially significant risk to human health, property or the environment. This includes hazardous or offensive developments, major hazard facilities (MHF), manifest quantity workplaces (MQW), explosives and mining sites as well as other sites subject to a condition of consent.

The Fire Safety Liaison Unit is responsible for:

  • Providing FRNSW advice on State significant developments (SSD)
  • Review and assessment of fire safety studies (FSS)
  • Providing recommendations on the content and effectiveness of emergency plans (EP)
  • Performance-based design briefs (PBDB) and initial fire safety report (IFSR) for developments that pose potentially significant risk.

Related documents

Download TypePublishedOwner
Access for fire brigade vehicles and firefighters (PDF , 2.8 MB)Fire Safety Guideline2020-11-17Fire Safety
Accessibility of fire hydrants (PDF , 220.8 KB)Position Statement Summary2024-04-29Fire Safety
Applicable Building Code of Australia (BCA) (PDF , 240.5 KB)Position Statement Summary2024-04-29Fire Safety
Application of fire sprinkler concessions under Specification 18 of the NCC (PDF , 182.8 KB)Position Statement Summary2024-08-30Fire Safety
Automated vehicle parking system (PDF , 188.4 KB)Position Statement Summary2024-04-29Fire Safety
Automatic storage and retrieval systems (ASRS) (PDF , 138.3 KB)Position Statement Summary2024-12-05Fire Safety
CFD zone modelling inputs (MS Word Document, 653.5 KB)Forms2024-11-01Fire Safety,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Consultation on the performance-based design brief (PBDB) (PDF , 218.0 KB)Position Statement Summary2024-08-30Fire Safety
Consultation with the relevant fire brigade, fire service or fire authority (PDF , 216.3 KB)Position Statement Summary2024-04-29Fire Safety
Dry fire hydrant system (PDF , 217.6 KB)Position Statement Summary2024-06-04Fire Safety
ESIP template (MS Word Document, 32.2 KB)Template2023-03-20Fire Safety Liaison Unit
Electric vehicles (EV) and EV charging equipment (PDF , 224.0 KB)Position Statement Summary2024-06-04Fire Safety
Emergency plan requirements at sites having lithium batteries (PDF , 252.8 KB)Position Statement Summary2024-12-05Fire Safety
Emergency services information package and tactical fire plans (PDF , 815.4 KB)Fire Safety Guideline2023-03-20Fire Safety Liaison Unit
Exemption from fire safety standards (PDF , 238.2 KB)Position Statement Summary2024-04-29Fire Safety
Extended fire hydrant coverage (PDF , 182.4 KB)Position Statement Summary2024-06-14Fire Safety
External combustible cladding (PDF , 177.8 KB)Position Statement Summary2024-06-14Fire Safety
FRNSW compatible Storz hose connections (PDF , 286.1 KB)Technical Information Sheet2026-01-13Fire Safety
FRNSW hose connections (PDF , 172.5 KB)Position Statement Summary2026-01-13Fire Safety
FRNSW meeting application (MS Word Document, 602.2 KB)Forms2026-01-30Fire Safety
FRNSW pump performance for high rise buildings (PDF , 215.5 KB)Position Statement Summary2024-12-05Fire Safety
FRNSW written report application (MS Word Document, 607.2 KB)Forms2026-01-30Fire Safety
Fire Safety Position Paper - Electric vehicles (EV) and EV charging equipment in the built environment v1.0 (PDF , 4.4 MB)Research2025-03-15Fire Safety
Fire brigade booster operating pressure (PDF , 181.9 KB)Position Statement Summary2024-12-05Fire Safety
Fire brigade boosters with inlet inserts (PDF , 394.8 KB)Technical Information Sheet2019-03-12Fire Safety
Fire doors with fire activated retaining devices (e.g. bolts) (PDF , 214.8 KB)Position Statement Summary2024-12-23Fire Safety
Fire engineering for existing buildings (PDF , 215.0 KB)Position Statement Summary2024-09-12Fire Safety
Fire hydrant concessions for existing buildings (PDF , 1.3 MB)Technical Information Sheet2020-02-27Fire Safety
Fire hydrant system - single vs multiple (PDF , 138.3 KB)Position Statement Summary2024-10-09Fire Safety
Fire hydrant system in existing building or premises (PDF , 211.8 KB)Position Statement Summary2024-09-12Fire Safety
Fire hydrant system in new building or premises (PDF , 184.6 KB)Position Statement Summary2024-08-30Fire Safety
Fire hydrant system signage (PDF , 602.3 KB)Position Statement Summary2024-12-05Fire Safety
Fire hydrants for minor residential development (PDF , 3.2 MB)Fire Safety Guideline2016-09-01Fire Safety
Fire safety in early childhood centres (PDF , 236.4 KB)Position Statement Summary2024-09-12Fire Safety
Fire safety in waste facilities (PDF , 826.3 KB)Fire Safety Guideline2020-02-27Fire Safety Liaison Unit
Fire safety study process (PDF , 219.3 KB)Position Statement Summary2024-06-14Fire Safety
Fire sprinkler system in existing building or premises (PDF , 214.1 KB)Position Statement Summary2024-09-12Fire Safety
Fire sprinklers in class 1 buildings (i.e. homes) (PDF , 177.7 KB)Position Statement Summary2024-08-30Fire Safety
Fire sprinklers in class 2 and 3 buildings (PDF , 220.1 KB)Position Statement Summary2024-09-30Fire Safety
Fixed suction connection for below-ground water supply (PDF , 212.9 KB)Position Statement Summary2024-08-30Fire Safety
Guideline for bulk storage of rubber tyres (PDF , 814.9 KB)Fire Safety Guideline2014-12-05Fire Safety Liaison Unit
Hazardous chemicals manifest (PDF , 206.6 KB)Technical Information Sheet2023-03-20Fire Safety Liaison Unit
Hydraulic fire safety system design (PDF , 217.1 KB)Position Statement Summary2024-12-05Fire Safety
Initial fire safety report (IFSR) application (MS Word Document, 647.6 KB)Forms2026-01-30Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Large-scale external LiBESS - Fire safety study considerations (PDF , 189.0 KB)Technical Information Sheet2023-07-26Fire Safety Liaison Unit
Light wall steel pipe in fire hydrant systems (PDF , 193.9 KB)Position Statement Summary2024-12-05Fire Safety
Notification and assessment of radiation gauge (MS Word Document, 595.9 KB)Forms2026-01-30Fire Safety Liaison Unit
Open yard storage of battery energy storage systems (BESS) (PDF , 276.2 KB)Position Statement Summary2024-12-05Fire Safety
Performance-based design brief (PBDB) consultation (MS Word Document, 683.6 KB)Forms2026-01-30Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit
Pilot operated pressure reduction valve (PO-PRV) installation (PDF , 382.7 KB)Position Statement Summary2024-12-05Fire Safety
Plastic pipe in combined fire hydrant and sprinkler systems (PDF , 175.2 KB)Position Statement Summary2024-12-05Fire Safety
Pressure reducing fire hydrant valve (PRFHV) (PDF , 177.7 KB)Position Statement Summary2024-08-30Fire Safety
Security/screen doors fitted to sole-occupancy units (SOUs) (PDF , 174.6 KB)Position Statement Summary2024-08-30Fire Safety
Self-storage facilities (PDF , 149.1 KB)Position Statement Summary2024-10-09Fire Safety
Small-bore suction connections (PDF , 212.7 KB)Position Statement Summary2024-06-20Fire Safety